🚆 Stuttgart 21: Grounding for a 33-km stretch ⚙️

For a rail project of this magnitude, it is essential to have technical solutions that fit precisely and function reliably over the long term.

PHILIPP supplied the appropriate grounding sockets and grounding connectors for the section of the line constructed by PORR.

The challenge: The bushings had to be precisely integrated into the track support plates. At the same time, different installation scenarios and a wide range of connection lengths had to be taken into account.

🔩 Our solution:
✔️ Supply of grounding sockets for embedding in the track slabs using flat steel, a threaded sleeve, and a stainless steel washer
✔️ Additional corrosion protection provided by the galvanized ends of the grounding sockets​
✔️ Supply of grounding connectors in various lengths

This enabled us to provide a grounding solution tailored to the project that meets the technical requirements and complies with applicable DB regulations.

👉 Are you planning a challenging construction project and need the right technical solution? Get in touch with us.

👉 Learn more about this and other reference projects

NEWS CATEGORIES
KEYWORDS
Scroll to Top

The PHILIPPGRUPPEis your competent partner for high-quality products in the fields of construction technology, rope and lifting technology and hydraulics.

Address: Lilienthalstraße 7-9, 63741 Aschaffenburg
Phone: +49 6021 40 27-0
Business hours: ·
Aussenaufnahme einer Baustelle mit einer in Betonfertigteil integrierten Verbindungsschiene zur Montage von Bauteilen
Nahaufnahme von Verbindung eines Drahtseils mit verpresster Schlaufe und Drehgelenk
Detailaufnahme von Hydraulik-Anschlüssen und Schlauchverbindungen
Groß dimensioniertes Carbon-Betonfertigteil hängend an verschiedenen Anschlagketten
Prüfung von Lasthaken mit einem Magnetpulver-Prüfgerät
Dreh-Kippgestell der PHILIPPGRUPPE an einem Lasthaken in einer Fabrikhalle