🌉 Custom lifting solution for the Franklin Bridge in Mannheim. 🏗️
The Franklin Bridge in Mannheim is considered the longest integral wooden bridge in the world. For this extraordinary construction project, the 32 carbon-concrete slabs that make up the bridge deck were equipped with a custom-developed transport anchoring solution from the PHILIPPGRUPPE. 💪
The particular challenge: The precast carbon-concrete elements have a thin slab thickness and a conical geometry. A customized solution was therefore needed to ensure safe transport and precise installation. ⚙️
Four short, shallow-embedded stainless steel flat steel anchors were used. In combination with a leveling sling, the concrete slabs were safely transported, precisely positioned, and successfully installed. 🤝
The result: A custom transport anchor solution for a challenging bridge project—safe, reliable, and successfully implemented in practice. 🚀
👉 Click here to view the Franklin-Steg reference project in Mannheim
👉 Click here to see more reference projects
👉 Click here to view our transport anchors