PHILIPPGRUPPE Aschaffenburg

High-capacity connection for the Wood Cluster Buchloe

Transport anchor and Power Duo systems for the precast concrete construction of one of the largest industrial construction projects in southern Germany.

Your project.

Our solution.

Every project has its own requirements. Our experts will help you find the right technical solution.

Initial situation and requirements

As part of the Athene project, Rudolf Hörmann GmbH & Co. KG is building a modern wood cluster in Buchloe. The site will feature a glulam plant, a high-capacity sawmill, and a sustainable energy supply system comprising a photovoltaic system, battery storage, and a biomass cogeneration plant.

The structural framework of the approximately 34,000 m² production hall consists of more than 80 precast columns, each weighing up to 50 metric tons. In addition, there are large-format wall and fire-resistant wall panels that had to be safely transported, installed, and permanently joined together.

To ensure rapid construction progress, solutions were needed that could reliably support heavy loads while also enabling practical installation procedures. This was particularly true for the structurally load-bearing connections between columns and wall panels, as well as for the installation of fire wall assemblies.

Our solution and implementation

Transport anchor systems were planned and implemented specifically for this project to facilitate the transport and installation of the large-format precast concrete elements. These systems enable the safe slinging and erection of columns weighing up to 50 metric tons, as well as numerous wall panels. The solutions, which are designed to match the specific geometries and loads of the components, support a controlled and efficient installation process on the construction site.

 

Many kilometers of Power Duo cable-loop rails were used for the structurally load-bearing connections of the precast concrete components. The Power Duo system enables quick and reliable connection of the components and, in particular, simplifies the installation of large-format firewall panels. This allows the individual elements to be efficiently positioned and connected without unnecessarily delaying the construction process due to complex connection solutions.

 

The engineering offices Mühlberg + Mair in Buchloe performed the structural calculations for this challenging construction project. The construction company Glass GmbH in Mindelheim handled the technical design of the precast concrete structure and the delivery of the concrete elements.

More than 80 precast columns, each weighing up to 50 metric tons, form the structural framework of the approximately 34,000 m² production hall.

PHILIPP’s Power Duo rope loops enable a load-bearing and easy-to-install connection for large-format wall and fire-rated wall panels.

Additional References

Scroll to Top

The PHILIPPGRUPPEis your competent partner for high-quality products in the fields of construction technology, rope and lifting technology and hydraulics.

Address: Lilienthalstraße 7-9, 63741 Aschaffenburg
Phone: +49 6021 40 27-0
Business hours: ·
Aussenaufnahme einer Baustelle mit einer in Betonfertigteil integrierten Verbindungsschiene zur Montage von Bauteilen
Nahaufnahme von Verbindung eines Drahtseils mit verpresster Schlaufe und Drehgelenk
Detailaufnahme von Hydraulik-Anschlüssen und Schlauchverbindungen
Groß dimensioniertes Carbon-Betonfertigteil hängend an verschiedenen Anschlagketten
Prüfung von Lasthaken mit einem Magnetpulver-Prüfgerät
Dreh-Kippgestell der PHILIPPGRUPPE an einem Lasthaken in einer Fabrikhalle